9/09/2006

Chester Township Public Schools

Black River – Bragg - Dickerson

Weekly Update

Activities of the last week:

Black River Middle School

  • Continued light fixture installation – renovation area’s
  • Completed interior wall framing ( vocal and science room)
  • Continued interior painting, ceiling installation (Science wing)
  • Continued HVAC ductwork installation (media, science and vocal)
  • Commenced HVAC unit installation – Media Center
  • Continued Carpet / floor tile installation
  • Completed cabinet installation (6 th Science, vocal, renovations)

 

Bragg Elementary School

  • Continued exterior site work for building addition
  • Completed plumbing fixture installation – Teacher Lounge, Media Center
  • Continued interior wall framing and ceiling grid – Media Center and Computer Lab
  • Continued rough / finish interior-exterior electric
  • Continued light fixture installation – Teacher Lounge
  • Continued interior painting (Teacher lounge / Computer Lab / Media Center)
  • Completed floor tile installation (Teacher Lounge, Computer Lab)

 

Dickerson Elementary School

  • Continued rough interior / exterior electric
  • Continued relocation of building electrical service
  • Completed plumbing fixtures – Nurses lounge
  • Commenced relocation of generator gas line
  • Completed ceiling / floor tile installation – Nurses Area
  • Continued site-work for addition building pad (gym) and drainage field
  • Continued installation of footing for K addition

Scheduled Activities for the week of September 05– September 08, 2006

Overall Project:

Black River Middle School

  • Continue installation of HVAC ductwork- vocal and new science room
  • Continue interior finishes (floor tile, painting, ceiling) renovation area
  • Continue interior electrical – lighting fixtures, fire alarm and outlets
  • Commence installation of building addition steel
  • Continue installation of new HVAC unit for Media Center
  • Commence installation of interior door – Renovation area’s
  • Continue plumbing installation – 6 th grade science, vocal
  • Complete township inspections

 

 

Bragg Elementary School

  • Continue interior electrical – Renovation area’s
  • Continue interior painting, ceiling (Media/Computer lab/Teachers lounge)
  • Continue relocation of building electrical service
  • Commence new addition building foundation layout and installation
  • Continue installation HVAC for Faculty Room
  • Complete township inspections

 

Dickerson Elementary School

  • Continue site-work for parking, roadway and drainage field
  • Continue building footing installation for K addition
  • Continue interior / exterior electrical
  • Commence foundation layout and installation for Gym
  • Complete township inspections

 

Impact to Students & Staff:

 

Noise:

 

  • Truck traffic and large machinery on site loading and unloading

 

Traffic and Parking:

    • Construction contractor parking is designated to the front & rear parking, not near pool parking ( Black River).
    • Bragg and Dickerson parking lots are closed for public use, due to extensive site construction

 

Cleanup:

  • Contractors were told to pick up any debris in the area.
  • Roadways will have to be kept clean in front of school and nearby roads.

 

Dickerson Elementary School – Nurse’s suite

 

 

 

 

 

Dickerson Elementary School – Nurse’s suite

 

 

Black River Middle School – Addition building pad

 

 

 

Black River Middle School – HVAC unit installation Media center

 

 

Black River Middle School – Renovated science room

 

 

 

Black River Middle School – New 6 th grade science room

 

Black River Middle School – Media corridor